City of Mesa - Meeting Minutes / Agendas
Follow this link to search this site or this link to skip to page content
header graphic header graphic
header graphic Home Resident Visitor Business City Hall Jobs header graphic
Site search starts here
Submit Website Search

CITY OF MESA

MINUTES OF THE

DESIGN REVIEW BOARD

NOVEMBER 5, 2008

A meeting of the Design Review Board was held in the Lower Level of the Council Chambers 57 East First Street, at 3:30 p.m.

MEMBERS PRESENT OTHERS PRESENT

Tim Nielsen – Chair Lesley Davis Chad Colby

Greg Lambright Debbie Archuleta Michael Jorgensen

Vince DiBella left at 5:35 Mia Lozano Helland Dan Brock

Tom Bottomley John Wesley Don Andrews

Craig Boswell arrived 5:33 Angelica Guevara Sean Lake

Delight Clark Amy Shackelford Malek Elkhoury

Cindy Lisonbee Tim Gallup

Veronica Gonzalez Tim MacDonald

Rob Dmohowski Eric Thomson

MEMBERS ABSENT Tim Lillo Steve Cook

Richard Clutter Arnold Wolk

Wendy LeSueur – Vice Chair Stephanie Rowe Jim Larson

Arnand Lengean Scott Sjolseth

Paul Saurey Others

John Code

Scott Mickeleit

1. Work Session:

CASE: Village Square

4210 E Main

REQUEST: Review of 2,245 sq. ft. restaurant building

DISCUSSION:

Boardmember Vince DiBella:

    Preferred the revised plan

    Wants change in plane where color changes

    Light fixture seems large for the building

Chair Tim Nielsen:

    Stucco screeds need to be shown on the follow-up submittal

CASE: Mesa Transitional Rehab

5358 E Baseline

REQUEST: Review of a 48,100 sq. ft. transitional rehabilitation nursing home

DISCUSSION:

Boardmember Tom Bottomley:

    Could cement board joint be used as a reveal in the tan aluminum

    Stone should be used at accent points

    The stone should be 2/3

    Explain how parapets return

    Provide a roof plan with the follow-up submittal

Boardmember Vince DiBella:

    Air louvers

    Provide a reveal at change of color

Chair Tim Nielsen:

    Concerned with shade for windows

    Concerned with joints for the cement board

    Could they break-up the long horizontal line of the wainscot and use the stone in other places

    Put the stone where the people are

CASE: Assisted Living

1051 N Stapley

REQUEST: Review of a 12,800 sq. ft. assisted living facility

DISCUSSION:

Boardmember Vince DiBella:

    Concern with venting attic

    Suggest dormers

    Concerned with screening of mechanical units

Chair Tim Nielsen:

    Landscape plan should be enhanced

    Landscape pallet shown at bottom of plan doesn’t match the top of the plan

Boardmember Greg Lambright:

    The roof could be metal

CASE: Atwood Industrial

7461, 7447, 7433, 7419 S Atwood and 7418, 7432, 7446, 7460 S 89 Place

REQUEST: Review of eight industrial buildings totaling 32,766 sq. ft.

DISCUSSION:

Boardmember Greg Lambright:

    Downspouts need to be more decorative

    Work on the proportions of the accent band

    Shade for south elevation

Boardmember Tom Bottomley:

    Appreciates the changes in material, but concerned with the flatness

    Should break the plan ½”

    Likes the overall concept of building and the colors

Boardmember Vince DiBella:

    Light fixtures will be very important

    Show the light fixtures on the follow-up submittal

Chair Tim Nielsen:

    If they keep the downspouts they need to be decorative

CASE: Red Mt. Tire & Auto

2041 N Recker

REQUEST: Review of a 9,850 sq. ft. auto repair/carwash facility

DISCUSSION:

Boardmember Tom Bottomley:

    Concerned with the bay doors facing the street

    Concern with color choices

    The colors will not be accepted by the community

    Cannot approve the Yuma Gold as a building color

    Shade structures are interesting and could be blue

    The main building color needs to change

    The colors don’t work together

    Maybe the wheat color, with rusty red and small amounts of blue like the car wash could work

    The forms need to be enhanced and broken up

    Too boxy

Boardmember Vince DiBella:

    A lot of mixed messages with colors, shapes, forms, architecture

    You have a southwest shape in metal, vibrant colors that suggest a modern approach, but the architecture doesn’t match it

    Mechanical units have to be screened

Chair Tim Nielsen:

    Processed yellow is very difficult

    There is too much color

    Could do accents in bright color

    These colors and forms collide

    Forms need to be enhanced

    Restudy the use of color

    Shade structures are well done

    Need a revised color board with the follow up submittal

Boardmember Greg Lambright:

    Tinsel structures can be great, if they are done well

    Colors will fade quickly

    Use natural material

    Colored block, rusticated metal and natural shades

    Need to look at store front colors and glass colors

    Different materials could improve the design

Boardmember Delight Clark:

    The Board needs to know how the shade structures are attached

    Concerned with the durability of the fabric material

    A well designed building with muted colors will draw attention, it doesn’t have to be bright colors

CASE: Checker’s/Rally’s

2828 S Country Club

REQUEST: Review of a 785 sq. ft. drive-thru restaurant

DISCUSSION:

Boardmember Vince DiBella:

    Metal is very shiny, could it be satin finish?

    Could replace the stone veneer with trendstone veneer, it would go better with the stainless

Boardmember Greg Lambright:

    Will there be landscaping on the green screen?

    Stone and stainless don’t go together

    Use Trendstone or no wainscot

    Revise wainscot, if one is used, to bottom of windows

Boardmember Tom Bottomley:

    Stone seems to be fighting the stainless

    Don’t use diamond pattern on the stainless

CASE: Falcon Pacific Aviation

4562 E Mallory Units 101 - 121

REQUEST: Review of an 85,430 sq. ft. hangar project

DISCUSSION:

Boardmember Vince DiBella:

    Why are they using stucco?

    Metal works if it is well thought through

Boardmember Tom Bottomley:

    Could the translucent panels be grouped so they are not so staccato

    Cold they use trendstone instead of split face

Boardmember Greg Lambright:

    Prefer to see a well done metal building

    Could use a gabien base and some gabien walls at the retention area

    Make the retention area usable

Chair Tim Nielsen:

    Gabien would be nice for the retention area

CASE: Hawker Beechcraft

5615 S Sossaman

REQUEST: Review of a 73,981 sq. ft. office/hangar project

DISCUSSION:

Boardmember Craig Boswell:

    Make sure Solid Waste Division approves location of trash enclosure

Chair Tim Nielsen:

    Likes the landscaping

    Exciting project

Boardmember Tom Bottomley:

    Likes the form of the overhang

    Really likes the way the office incorporates into the hangars

CASE: Sonic Drive-In

1229 N Power

REQUEST: Review of a remodel and change in exterior illumination

DISCUSSION:

Boardmember Greg Lambright:

    Could it be ground faced masonry with a metal roof?

    Too much going on, should be simplified

    New shade structure doesn’t go with the buildings

    Too many roof types

    Darker color fights with the green

    Doesn’t think the new canopy style goes with the existing building

    The new elements don’t tie in with the rest of the building

    It’s a mish-mash of different things

    Wants the red from the neon, could it be painted

    Need to get rid of one or two of the roof types

    It would be nice if the roofs all tied in together

    There are very strong elements on the existing buildings and the new shade canopy is a very strong element, but they don’t work together

    Doesn’t like the new arched canopies with the existing architecture

    No arched canopies, they don’t tie in with the any architecture of any of the buildings

Boardmember Tom Bottomley:

    Sleek versus rustic

    Warm colors don’t work with sleek fast food theme

    Concerned with stone, could it be ground faced, or trendstone?

    Could the tile be metal?

    The teal roof clashes with the green on the Baseline store, the columns should be teal or a building color

    The buttons will work fine

    Could they use a darker color at the fascia

    Agreed the existing canopies should have the new fascia but not the arched canopies

    The arched canopies fight the existing architecture, the buildings will look like a retrofit, not a remodel

    The warmer elements fight the brushed aluminum

Boardmember Craig Boswell:

    Appreciated that the attachment system would be concealed, did not want it latched on

    Too many different things going on

    Liked the different levels of canopies

    Concerned with the drive-thru canopy

    OK with staff review of the other stores if they are spread out throughout the City

Boardmember Tim Nielsen:

    Thought staff could review the other sites with Board direction

    Boardmember Delight Clark:

    Concerned with the fabric canopy structure

    Did not want the fabric to yellow in the sun

A. Call to Order:

      Chair Tim Nielsen called the meeting to order at 5:01 p.m.

B. Approval of the Minutes of the  October 1, 2008 Meeting:

      On a motion by Vince DiBella seconded by Delight Clark the Board unanimously approved the minutes.

C. Take Action on all Consent Agenda items:

D. Design Review Cases:

CASE #: DR08-74 Banner Heart Hospital 3rd Floor Addition

LOCATION/ADDRESS: 6750 East Baywood Ave

REQUEST: Approval of a 26,187 sq. ft. addition to existing hospital

COUNCIL DISTRICT: District 5

OWNER: Banner Health Systems

APPLICANT: Deva Powell, HKS Inc

ARCHITECT: John Niziolek, HKS Inc

STAFF PLANNER: Mia Lozano-Helland

REQUEST: Approval of a 26,187 sq. ft. addition to existing hospital

SUMMARY: This case was removed from the consent agenda do to a conflict.

Chair Tim Nielsen declared a conflict and turned the meeting over to Vince DiBella.

MOTION: It was moved by Greg Lambright and seconded by Tom Bottomley that DR08-74 be approved with the following conditions:

    1. Compliance with the development as described in the Design Review Board staff report and as shown on the site plan, landscape plan, floor plans and exterior elevations:

    2. Windows facing towards the adjacent residential neighborhood will have blinds pre-set to a specific angle to protect the privacy of the adjacent neighborhood.

    3. Provide plant materials in landscape area at north property line where trash enclosure will be removed.

    4. Compliance with all conditions of approval and requirements of Z05-103.

    5. Compliance with all conditions of approval and requirements of Z08-67

    6. Compliance with all City development codes and regulations.

    7. Compliance with all requirements of the Development Services, Engineering, Transportation, and Solid Waste Departments.

    8. All backflow preventers 2” or larger shall be screened with landscape material located within a 6’ radius of the backflow preventer. All backflow preventers less than 2” shall be placed in a wire mesh basket and painted green. (The City of Mesa has requested the change to green, to discourage theft.)

    9. Fire risers, building downspouts and roof access ladders are to be located within the building.

VOTE: Passed 5 – 0 – 1 (Boardmember Nielsen abstained)

CASE #: DR08-75 Express Car Wash

LOCATION/ADDRESS: 2750 East University Drive

REQUEST: Approval of a 3,660 sq. ft. car wash

COUNCIL DISTRICT: District 2

OWNER: Count Realm, LLC

APPLICANT: Pew & Lake

ARCHITECT: Andrews Design Group

STAFF PLANNER: Joe Welliver

REQUEST: Approval of a 3,660 sq. ft. car wash

SUMMARY: Don Andrews and Sean Lake represented the case. Mr. Andrews explained the changes made since the work session.

Boardmember Greg Lambright confirmed the pilasters would be split faced block. He thought the blue seemed dark. He stated the X seemed to be a sign, and wasn’t doing anything for the building. He suggested the X face University.

Boardmember Vince DiBella confirmed the awnings would be fastened behind the tube and would not be visible.

Chair Tim Nielsen stated the main traffic is on University and the south elevation is the least designed, and should be the best elevation. He stated they need to enhance the canopy on University. He suggested providing architecture on the canopy which the sign could be attached to. By attaching the sign to the canopy it would be closer to University and more visible. He stated the project needed to have 4-sided architecture.

In response to suggestions by Boardmember Tom Bottomley Sean Lake and Don Andrews stated they could pull the SES in, however, they could not move the windows very much because there was a bathroom next to them. He stated the roll-up doors could be widened on the entry side, however, they did not want them to be wider at the exit, because they wanted it to be clear which doors were the entry. He stated the could be shifted slightly so they appeared more centered. Mr. Andrews stated they wanted the X element to draw people to the entry.

MOTION: It was moved by Tom Bottomley and seconded by Greg Lambright that DR08-75 be continued to the December 3 meeting:

VOTE: Passed 5 – 0

CASE #: DR08-76 Walgreen’s

LOCATION/ADDRESS: 10825 E. Baseline Rd.

REQUEST: Approval of a 14,550 sq. ft. drug store

COUNCIL DISTRICT: District 6

OWNER: CP Signal LLC

APPLICANT: Khoury Engineering

ARCHITECT: Timothy Gallup

STAFF PLANNER: Lesley Davis

REQUEST: Approval of a 14,550 sq. ft. drug store

SUMMARY: Chair Tim Nielsen declared a conflict and turned the meeting over to Vince DiBella.

Staffmember Lesley explained the applicant had agreed to the conditions of approval and to move the trash enclosure.

Boardmember Tom Bottomley agreed with staff that the tower needed to be 4-sided; the tile should match and thought the columns should be expressed more and be deeper. He liked the proportions of the center.

Boardmember Greg Lambright agreed with staff concerns.

MOTION: It was moved by Greg Lambright and seconded by Delight Clark that DR08-76 be approved with the following conditions:

    1. Compliance with the development as described in the Design Review Board staff report and as shown on the site plan, landscape plan, floor plans and exterior elevations with the following modifications to be provided to Design Review staff for review and approval at least one week prior to submitting construction documents to the Building Safety Division:

        a. Revise the pedestrian path from Signal Butte to the building so that it is a straight path adjacent to a landscape island on one side rather than between two parking stalls.

        b. Revise foundation base landscape requirements per §11-15-3(C) of the Zoning Ordinance. This requirement has not been met on the east side of the building.

        c. Work with staff to revise the color placement on the building to more similarly reflect the center.

        d. Details and proportions of columns, cornices, awnings and wainscot to match the shopping center. Trash enclosure gates and light standards also must match what has been approved for the center.

        e. Trash enclosure for the adjacent building to the east to be relocated to the northeast corner of the Walgreens site, eliminating the parking spaces in that location, and allowing the parking area east of Walgreens to be redesigned eliminating the dead end parking.

    2. Compliance with all City development codes and regulations.

    3. Compliance with all requirements of the Development Services, Engineering, Transportation, and Solid Waste Departments.

    4. Compliance with all requirements of the Subdivision Regulations if the pad/building sites are to be individually owned or if there is to be a condominium form of ownership.

    5. A comprehensive sign plan has been approved for this development. (BA08-21). All signage must be in compliance with this approved document.

    6. Light fixtures and textures for pedestrian crossings are to match what has been approved for the adjacent shopping center as part of case DR07-009.

    7. All backflow preventers 2” or larger shall be screened with landscape material located within a 6’ radius of the backflow preventer. All backflow preventers less than 2” shall be placed in a wire mesh basket and painted green. (The City of Mesa has requested the change to green, to discourage theft.)

    8. Fire risers, building downspouts and roof access ladders are to be located within the building.

    9. Provide two half-size color elevations, one full size and one 8-1/2 X 11 set of reproducible revised site plans, landscaping plans and elevations showing compliance with conditions of approval for this case to the Design Review Staff prior to submitting for building permit application.

VOTE: Passed 5 – 0 – 1 (Boardmember Nielsen abstained)

E. Discuss, receive comment and recommend to City Council the following Design Review Cases:

    None

F. Discuss, receive comment and take action on the following appeals of Administrative Design Review:

    Staffmember Lesley Davis explained the application to the Board.

    After reviewing the original case file and photos of what was built.

      MOTION: It was moved by Tom Bottomley and seconded by Greg Lambright that the administrative approval request for DR07-48 and DR07-49 be approved with the following conditions:

      The Dooley wall be allowed to remain subject to the wall along the street and turning the corner one panel being changed to split faced, and the remainder of the wall in visible area to be painted to match the building.

      VOTE: 5 – 0

G. Other business:

    Discuss the Mesa Gateway Strategic Development Plan Design Guidelines Manual

      Planning Director, John Wesley presented the Mesa Gateway Strategic Develoment Plan Design Guidelines Manual. He explained the document would help staff and future developers establish a vision for the airport in the future. He stated future developments would be reviewed compared to this document.

      Chair Tim Nielsen confirmed staff will give developers a copy of this document to use as guidelines. He asked if there would be incentives for LEED developments or if LEED would be mandatory. Mr. Wesley stated there could be incentives; however, they would not be monetary. He questioned how transportation and urban development would work. He liked the vision and the flexibility. He questioned what weather they would go through the same processes as other development.

      Boardmember Greg Lambright confirmed there would not be a separate Advisory Board for the area; the project would go through normal development processes.

      Boardmember Tom Bottomley confirmed the document was intended to point development in the right direction from the beginning. He liked the flexibility of the document and hoped it would inspire creative development.

      Boardmember Craig Boswell stated he was looking for the day when there would be more photos of Mesa projects used as examples, instead of photos of other communities.

H. Adjournment:

    The meeting was adjourned at 6:54 p.m.

Respectfully submitted,

Debbie Archuleta

Planning Assistant

da